Developer: Basin Electric Power Cooperative Project details and status: The project, identified by Southwest Power Pool’s (SPP) Aggregate Transmission Service process, is required to provide additional transmission capability in Saskatchewan, Canada. The 230 kV Wheelock–Saskatchewan and Tande–Saskatchewan project, which entails about 50-mile (80-km) and 60-mile (96.5-km) lines respectively, will connect to SaskPower transmission equipment at […]