Developer: Minnesota Power and Great River Energy (GRE) Project details and status: The USD573.5 million project includes 128 miles (204.8 km) of 345 kV single-circuit transmission line between the Big Stone substation in South Dakota and the Alexandria substation in Minnesota, with a second 345 kV line being added between the Alexandria and Monticello substations. […]

This content is available to only paying subscribers.