The Goa project involves the construction of a line-in-line-out (LILO) of one circuit of the 400 kV Narendra (existing)–Narendra (new) double-circuit quad line at Xeldem; the 400 kV Xeldem–Mapusa double-circuit quad line; and a 2x500 MVA, 400/220 kV substation at Xeldem.

This content is available to only paying subscribers.