Georgian state-owned power company Georgian State Electrosystem (GSE) has issued an international prequalification tender for the design, engineering, manufacturing as well as transportation to site, unloading, temporary storage, installation and commissioning of the 500 kV, 100 km long Ksani-Stepantsminda overhead transmission line (OHL) [including 3xACSR conductors and an optical groundwire (OPGW)] and associated equipment.

This content is available to only paying subscribers.