The project is part of a 2009 study conducted by British Columbia Transmission Corporation, now integrated with BC Hydro, and the Alberta Electric System Operator (AESO), which concluded that investing in setting up a new intertie could benefit the area significantly.

This content is available to only paying subscribers.