International competitive bids are invited for undertaking the engineering and construction works for the 69/12 kV, 33.6 MVA substation in Burbank. The scope of work includes the installation of three 69/12 kV, 33.6 MVA transformers, three 69 kV underground lines, and six 69 kV gas-insulated switchgear (GIS), to be installed in an enclosed CMU structure.

This content is available to only paying subscribers.