The administrative board of Lincoln Electric System (LES) has selected a route for the proposed Central Lincoln Reliability Project, which includes a 115 kV transmission line running through central Lincoln, Oregon. Approximately 63 per cent of the route will be buried cable and 37 per cent will be overhead power lines.