The administrative board of Lincoln Electric System (LES) has selected a route for the proposed Central Lincoln Reliability Project, which includes a 115 kV transmission line running through central Lincoln, Oregon. Approximately 63 per cent of the route will be buried cable and 37 per cent will be overhead power lines.

This content is available to only paying subscribers.