Lithuanian transmission system operator (TSO) Litgrid has received permission for the construction of the 400 kV Alytus high voltage direct current (HVDC) back-to-back station, which is part of the LitPol Link power interconnection between Lithuania and Poland.

This content is available to only paying subscribers.