The BRL1.6 billion project aims to transmit energy generated by the Teles Pires hydroelectric complex, which comprises the Sao Manoel (700 MW), Teles Pires (1,820 MW), Colider (300 MW) and Sinop (401 MW) plants.
This content is available to only paying subscribers.