International prequalification bids are invited for the design, engineering, manufacturing, transportation to site, unloading, temporary storage, installation, commissioning ,tests and obtaining essential permits for the 400 kV Albania– North Macedonia Line, on a turnkey basis (Lot I).

This content is available to only paying subscribers.