The Southern African Power Pool (SAPP) has invited expressions of interest (EoI) to carry out feasibility studies for the Kolwezi–Solwezi Power interconnector project funded by the African Development Bank’s (AfDB) NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF).