Competitive bids are invited for the design, manufacture, testing, supply and installation of approximately 895-km-long high voltage direct current (HVDC) submarine cables (which will be laid at a maximum water depth of 2,960 metres) and land cables for the EuroAsia Interconnector’s Link 2 (Cyprus–Crete link); and the HVDC, medium voltage direct current (MVDC) and high voltage alternating current (HVAC) land cables in Cyprus.

This content is available to only paying subscribers.