The project involves the establishment of four 765 kV single-circuit, and two 400 kV double-circuit transmission lines aggregating 1,000 km, and two 765/400 kV substations to strengthen the transmission system in the Indian states of Madhya Pradesh, Maharashtra and Gujarat.