EKPC successfully integrates into PJM Interconnection
East Kentucky Power Cooperative (EKPC), which provides transmission and generation services to 16 not-for-profit cooperatives, has successfully integrated into PJM Interconnection.
Read MoreJune 1, 2013
East Kentucky Power Cooperative (EKPC), which provides transmission and generation services to 16 not-for-profit cooperatives, has successfully integrated into PJM Interconnection.
Read MoreApril 29, 2013
The Eastern Interconnection Planning Collaborative (EIPC) has completed the transmission planning study of the Eastern Interconnection grid with the issue of a draft report of the study’s second phase.
Read MoreDecember 24, 2012
The Kentucky Public Service Commission (PSC) has formally authorised East Kentucky Power Cooperative Incorporated (EKPC), which provides transmission and generation services to 16 not-for-profit cooperatives, to fully integrate with PJM Interconnection.
Read MoreOctober 1, 2010
The Energy Future Coalition (EFC), a group comprising renewable energy advocates, environmentalists, utilities and transmission developers, has voiced support for the proposed FERC rule, which would necessitate regional transmission planning processes, accounting of energy policy objectives and establishment of cost allocation methodologies.
Read MoreJanuary 19, 2010
Charles River Associates (CRA) has recently published its findings from the SPP WITF Wind Integration Study it had undertaken for the Southwest Power Pool (SPP).
Read More