Tag: Lower Colorado River Authority

BESS Power begins FIS for Lund Storage project

BESS Power Corporation (BESS Power) has announced the commencement of the Full Interconnection Study (FIS) for its Lund Storage project in Texas, in collaboration with the Electric Reliability Council of Texas (ERCOT) and the...

Read More

525 kV Pecos West Intertie, US

Developer: Texas-based Grid United Project details and status: Through the intertie that will, which would connect to the grid systems of El Paso Electric Company and the Lower Colorado River Authority, Grid United is proposing...

Read More

LCRA TSC and AEP Texas file application with Texas PUC to amend CCN for 345 kV project

The Lower Colorado River Authority Transmission Services Corporation (LCRA TSC) and American Electric Power (AEP) Texas have filed a joint application with the Public Utility Commission (PUC) of Texas to amend their respective certificates of convenience and necessity (CCN) for the 345 kV Bakersfield–Solstice Transmission Line Project in Pecos County, Texas.

Read More
Loading

Login

Forthcoming Conferences

Latest Reports

Newsletter Archive