The USD3 billion project includes the construction of a 730-mile (1,175-km), ±600 kV high voltage direct current (HVDC) overhead double-circuit transmission line, which will deliver renewable energy from wind energy projects near Rawlins in Wyoming to Colorado, Utah and Nevada. The line will run from south-central Wyoming crossing Colorado and Utah, with a potential interconnection at the Intermountain power project near Delta, Utah, and terminate at the Marketplace Hub in southern Nevada.

This content is available to only paying subscribers.