The Waasigan Transmission Line (formerly known as Northwest Bulk Transmission Line) consists of a new 230 kV double-circuit transmission line between the Lakehead transformer station (TS) in the municipality of Shuniah and the Mackenzie TS in the town of Atikokan, and a new 230 kV single-circuit transmission line between Mackenzie TS and Dryden TS in the city of Dryden.

This content is available to only paying subscribers.