Developer: Basin Electric Power Cooperative Project details and status: The Patent Gate–Pioneer transmission project aims to strengthen the region’s transmission load-serving capability and address reliability constraints in North Dakota. The project involves the construction of a 50-mile (80 km), 345 kV transmission line between the existing Pioneer generation station substation, located northwest of Williston, North […]

This content is available to only paying subscribers.