The Estonian-Finnish high-voltage direct current (HVDC) power transmission connection Estlink 1 was restored on January 5, 2024, after an hour and a half of its going off-grid due to a technical failure. The link's power capacity stood at 50 MW when it went off-grid. The disruption to power transmission between the two countries was caused […]
This content is available to only paying subscribers.