The Honduran state-owned Empresa Nacional de Energia Electrica (ENEE) announced that a transient and atypical failure in the country’s interconnection with Nicaragua at 9:22 am on March 1, 2025, caused a widespread blackout. The failure was experienced in the 98-km-long, L617 border transmission line, which connects the Los Prados substation in Honduras and León substation […]

This content is available to only paying subscribers.