The Midcontinent Independent System Operator (MISO) has submitted its Large Load Addition Resource Study (LARS) proposal to the Federal Energy Regulatory Commission (FERC). The plan seeks to implement a fast-track, 120-day review process to evaluate large electricity demands exceeding 200 MW, alongside the new local power generation designated to supply them. This dual-study model aims […]

This content is available to only paying subscribers.