Basin Electric Power Cooperative, a not-for-profit generation and transmission cooperative owned by 138 member cooperative systems across nine states, will host two public open houses in September 2026 to gather feedback on its proposed 345 kV Leland Olds Station (LOS)–Burkley–Crane Creek transmission project. The project includes approximately 118 miles (190 km) of new line and a […]
This content is available to only paying subscribers.