The Beauly-Denny line project involves replacing the existing single-circuit, 132 kV overhead line connecting Beauly, near Inverness, and Wharry Burn near Stirling, with a 220 km long, 400 kV double-circuit line from Beauly to Denny through Wharry Burn.