Bulgaria’s transmission system operator (TSO) Elektroenergien Sistemen Operator EAD (ESO) is planning to launch the construction of a 110-km-long, 400 kV overhead transmission line between the Dobrudja and Burgas power substations on November 22, 2018.

This content is available to only paying subscribers.