The 345 kV East Loop transmission project will span about 175 miles (238 km) from Leland Olds Station, near Stanton, North Dakota, to the Tande substation, near Tioga, North Dakota, with the reconstruction of a 345 kV substation at Leland Olds.

This content is available to only paying subscribers.