Developer: Estonia’s transmission system operator (TSO) Elering and Finland’s TSO Fingrid Project details and status: The 80-km Estlink 3 interconnection will be constructed along similar lines to the existing Estlink 1 and Estlink 2 cables. The EstLink 1 subsea interconnection has a capacity of 350 MW and has been in operation since 2006. EstLink 2, […]