Finland’s transmission system operator (TSO) Fingrid, along with other Nordic TSOs, has planned a pilot project that aims to decrease the minimum bid size of manual Frequency Restoration Reserve (mFRR) from the current 5 MW to 1 MW.
This content is available to only paying subscribers.