German transmission system operator (TSO), Amprion GmbH, has commenced cable pulling works to replace conductor cables on the Ultranet high voltage direct current (HVDC) link between the Weißenthurm and Koblenz substations in Rhineland-Palatinate. Ultranet is a 340-km HVDC corridor connecting Osterath in North Rhine-Westphalia (NRW) with Philippsburg in Baden-Württemberg. The southern section between Mannheim-Wallstadt and […]

This content is available to only paying subscribers.