Ghana Grid Company Limited (GRIDCo) is seeking international contractors for the construction of a 185 km long, 330 kV Prestea-Kumasi overhead line and the 330/161 kV Kumasi substation. The scope of work also entails installation of a smart grid direct load control (DLC) pilot system, conducting a feasibility study, and training for further expansion of the smart grid DLC system. The last date for submission of bids is September 6, 2013.

This content is available to only paying subscribers.