The 225/30 kV Projetd’ Interconnexion Électrique Guinée Mali (PIEGM) or the Guinea–Mali Electric Interconnection Project, involves the construction of a 714-km-long, 225 kV transmission line between Guinea and Mali, of which 590 km is in Guinea and 124 km in Mali.