Developer:  India’s Sterlite Power Transmission Limited (SPTL) Project details and status: The INR16 billion project entails the construction of the 500 kV, 344-km Tucuruí II–Marituba C1 transmission line, connecting Brazil’s largest hydropower plant at Tucuruí to the metropolitan region of Belém – adding over 1 GW to the industrial region of Belem. The Marituba project […]

This content is available to only paying subscribers.