Mayflower Wind—a 50-50 joint venture (JV) between energy companies Shell New Energies, US and the newly-formed US arm of Ocean Winds (a JV between EDP Renewables and ENGIE)—recently acquired a 1.2 GW interconnection queue position from independent grid operator Anbaric at the retired Brayton Point coal-fired power plant site south of Boston, Massachusetts.
This content is available to only paying subscribers.