Developer: German transmission system operator (TSO), 50Hertz Transmission GmbH Project details and status: Ostwind 4 involves the installation of a 525 kV high-voltage direct current (HVDC) transmission line in the German Baltic Sea, marking the first deployment of this voltage level and technology by 50Hertz in the region. The system is designed to connect the […]

This content is available to only paying subscribers.