The project involves the establishment of the 400 kV pooling station at Fatehgarh (with a provision to upgrade to 765 kV); the 765 kV Fatehgarh pooling substation–Bhadla (POWERGRID) double-circuit line (initially to be operated at 400 kV); and two 400 kV line bays and 1x125 MVAr bus reactor at the Fatehgarh pooling substation.